top of page

Irving Signature Bridge

Bridgefarmer designed a new signature bridge connecting the north and south sides of SH 114 near the old Dallas Cowboy stadium. The signature bridge will serve as a connector for commuters and a grand entrance into the city of Irving, for the thousands of drivers who pass through each day.

This bridge will give a 78-acre development site direct access to a proposed

Dallas Area Rapid Transit rail station and open the area up with a direct link

to the property from SH 114.

 

The project’s goal is to provide safe connectivity with an iconic landmark

bridge to connect the development to a new DART Transit station. The

planned cable stay signature bridge will become a gateway to the

City’s new commercial center and will incorporate covered pedestrian

walkways on both sides of the bridge.

 

The project will be constructed by Webber, LLC of Irving, and is due to 

break ground in late 2019.

irving_8 - Photo.jpg

​

Project Construction Cost Estimated: $39.5 Million

Completion Date: Ongoing

Client: Texas Department of Transportation

bottom of page